Electrical Contract: 7 Free Templates to Copy and Use

An electrical contract names the electrician and the customer, describes the work, sets the price and payment terms, says who pulls the permit, and carries both signatures. Seven templates to copy: service call, residential project, commercial job, subcontractor, emergency authorization, change order and completion sign-off.

Josh · Nov 15, 2026 · 15 min read

  • electrical contract
  • electrical contract template
  • electrician contract
  • electrical work contract
  • electrical subcontractor agreement
  • electrical business

An electrical contract is a written agreement between an electrician and a customer that describes the work, the price, the payment terms and who pulls the permit, and it carries both signatures. The seven templates below cover a service call, a residential project like a panel upgrade, a commercial job, a subcontractor, an emergency authorization, a change order and a completion sign-off. Copy one into a document, replace the brackets with your own details, and check it against your state's rules before you use it.

A clipboard with a printed form and a pen on a workbench beside an open residential breaker panel with neatly routed wires

What an electrical contract has to cover

eForms lists four items that belong in an electrical contract: contractor and client information, scope of work, project timeline and payment terms. Legal Templates adds the date and state, legal clauses such as choice of law, dispute resolution and cancellation, and signature lines. Adobe's guide adds who pays for licenses and fees, safety measures and liability insurance. Together they give you the core of every form below.

PartWhat to writeExample line
PartiesYour business name, address, phone, license number, and the customer's name and service address"Service address: 2210 Alder Ct, detached garage"
ScopeCircuits, devices and equipment, plus what is not included"Install one 240V, 50A circuit to garage. Drywall repair not included."
Tools and materialsWho supplies them, with brands and model numbers for equipment"Contractor supplies wire, breaker and receptacle. Owner supplies charger."
PermitsWho pulls the permit and who pays the fee"Contractor pulls permit; fee billed at cost"
ScheduleStart date, expected finish, power shutoff hours, and what moves the dates"Power off 9 a.m. to 3 p.m. on day one"
Price and paymentTotal or hourly rate, deposit, due dates, accepted methods"Balance due after final inspection"
InsuranceYour liability carrier and policy number"Certificate of insurance attached"
ChangesHow added work gets priced and approved"No extra work without a signed change order"
SignaturesBoth parties, with dates"Signed and dated by both"

Adobe notes that most electricians want to see the site in person before writing a contract. That visit is where the scope gets specific. "Fix the kitchen outlets" invites a dispute. "Replace four countertop receptacles with GFCI receptacles on the existing two circuits" does not.

State rules to check before you send it

Rules for electrical contracts come from your state and sometimes your city. Three examples show how much they vary.

In Texas, the Department of Licensing and Regulation requires four things on every proposal, invoice and written contract from an electrical contractor: the contractor's name, address, phone number and license number. Invoices and written contracts must also carry a notice that the contractor is regulated by the department, with its mailing address, phone numbers and complaints web address. The exact wording is in the department's compliance guide, linked under Sources.

In California, the Contractors State License Board says a written contract is required for all home improvement projects over $500. The contract needs a detailed payment schedule, a completion date and written direction on who gets the permits. Any change to price or scope must be a written change order signed before the change. The down payment cannot be more than $1,000 or 10 percent of the contract price, whichever is less.

In Washington, the Department of Labor and Industries says electrical work requires a permit and inspection, with a few exceptions. An electrical contractor must buy the permit for work it does on a customer's property, and the permit comes before any work starts. Some cities run their own permits and inspections, so the permit clause in your contract should name the right office.

The FTC's Cooling-Off Rule can also apply. It covers sales of $25 or more made at the buyer's home, including when the customer invites you over to make a presentation. The buyer can cancel until midnight of the third business day after the sale, and the seller must provide two copies of a cancellation form. The federal rule has an exception for a real emergency the buyer contacted you about. It applies only when the buyer gives you a separate, dated and signed statement in their own handwriting that describes the emergency and waives the right to cancel.

Check your own licensing board before you rely on any template. If you work in more than one state, keep a version of each form for each one.

Template 1: Service call agreement

Use this for a single visit: a breaker that keeps tripping, a dead outlet, a flickering fixture. It is short enough to sign on a tablet at the door.

ELECTRICAL SERVICE CALL AGREEMENT

Date: [date]
Electrician: [company name], [address], [phone], [email]
License no.: [number]
Customer: [name], [service address], [phone], [email]

1. PROBLEM REPORTED
[Customer's description, e.g., "bedroom outlets dead, breaker will
not reset"]

2. WORK AUTHORIZED
Diagnose the problem and complete the repair described below.
[e.g., "Trace bedroom circuit, replace failed receptacle and damaged
splice in first box"]
Work beyond this description needs the customer's approval first.

3. PRICE
Diagnostic / trip fee: $[amount], [credited to the repair / not credited]
Labor: [flat price $[amount] / $[rate] per hour, billed in [15]-minute
increments after the first hour]
Parts: [itemized on the invoice at listed price]

4. PAYMENT
Due on completion. Accepted: [cash, check, card, other].
Late payments: [your policy, if any, and only as allowed in your state]

5. ACCESS AND CONDITIONS
Customer will provide access to the panel, attic or crawl space as
needed and agrees that power may be shut off during the work. The
electrician is not responsible for existing wiring, devices or
equipment that are found damaged, undersized or not to code. Those
are reported to the customer and quoted separately.

6. WARRANTY
Labor on this repair is warranted for [number] days.
Parts carry the manufacturer's warranty.

Signed: ____________________ Electrician   Date: ________
Signed: ____________________ Customer      Date: ________

The existing-wiring clause matters most in older homes. You open a box to swap one receptacle and find scorched insulation on the next splice. The clause tells the customer in advance that you will report it and price it before you touch it.

Template 2: Residential electrical project contract

Use this for planned work with a larger price: a panel upgrade, an EV charger circuit, a kitchen remodel, a whole-house rewire. Other forms attach to it.

RESIDENTIAL ELECTRICAL PROJECT CONTRACT

Date: [date]   State: [state]
Contractor: [company name], [address], [phone], [email]
License no.: [number]   Insurance: [carrier, policy no.], certificate attached
Owner: [name], [property address], [phone], [email]

1. SCOPE OF WORK
[e.g., "Remove existing 100A main panel and install a 200A main
breaker panel with new breakers for all existing circuits. Label
every circuit. Coordinate the service disconnect and reconnect with
the utility."]
Materials: [panel brand and model, breaker types, wire sizes, devices]
Supplied by owner: [fixtures, charger, appliances, if any]
Not included: [drywall patching, painting, trenching, utility fees]

2. PLANS AND SPECIFICATIONS
[Drawings, load calculation or fixture schedule attached as Exhibit A /
none]

3. PERMITS AND INSPECTIONS
[Contractor / Owner] will obtain the electrical permit from [office].
Fees are [included / billed at cost]. Work is scheduled around
required inspections and any utility appointment.

4. SCHEDULE
Start: [date]. Estimated completion: [number] working days after start.
Power will be off during [hours] on [days]. Delays caused by
inspections, the utility, material shortages or hidden conditions
extend these dates.

5. HIDDEN CONDITIONS
If walls, ceilings or the existing system reveal conditions not visible
at the estimate, such as damaged wiring, overfilled boxes or a missing
ground, the contractor will stop that part of the work and notify the
owner. Added work is priced by written change order before it continues.

6. PRICE AND PAYMENT
Contract price: $[total].
Deposit on signing: $[amount] (check your state's deposit limit)
Progress payment: $[amount] when [rough-in passes inspection]
Final payment: $[amount] on completion and final inspection.

7. OWNER RESPONSIBILITIES
Provide access, clear the work areas, and move stored items away from
the panel. Tell the contractor about medical equipment, sump pumps,
freezers and alarm systems that depend on power.

8. CONTRACTOR RESPONSIBILITIES
Supply labor, tools and materials named above. Follow the electrical
code adopted where the work is done. Protect floors and finishes in the
work area. Remove debris and old equipment at completion.

9. WARRANTY
As stated in the completion sign-off (Template 7).

10. CHANGES
Any change to scope, price or schedule must be written and signed by
both parties before the changed work is done.

11. CANCELLATION AND TERMINATION
Owner's right to cancel: [notice required by law, with cancellation form
attached if it applies]. Either party may end this contract for an
uncured breach after [number] days' written notice. Completed work is
paid at the contract rate.

12. DISPUTES
The parties will try to resolve disputes by [discussion, then mediation].
Governing law: [state].

Signed: ____________________ Contractor    Date: ________
Signed: ____________________ Owner         Date: ________

Ask about medical equipment before you set the shutoff hours. A customer with an oxygen concentrator or a basement sump pump needs a plan for the hours the main is off, and the contract is the place to write it down.

Five-step diagram of an electrical job's paperwork: site visit and estimate, signed contract, permit, change order if needed, and inspection with sign-off

How the templates fit around one job. Diagram only.

Template 3: Commercial electrical contract

Use this for a tenant build-out, a lighting retrofit or new equipment circuits in a shop or office. Commercial customers often sign through a property manager, so the form names who can approve changes.

COMMERCIAL ELECTRICAL CONTRACT

Date: [date]   State: [state]
Contractor: [company name], [address], [phone], [license no.]
Client: [business name], [billing address]
Site: [address, suite]   Site contact: [name, phone]
Authorized to approve changes: [name, title]

1. SCOPE OF WORK
[e.g., "Replace 42 fluorescent troffers with LED fixtures per the
attached fixture schedule. Add two 20A dedicated circuits for the
break room."]
Plans and specifications: [Exhibit A]

2. WORKING HOURS AND SHUTDOWNS
Work will be done [during business hours / after hours, 6 p.m. to
6 a.m.]. Planned power shutdowns need [number] hours' notice to the
site contact.

3. PERMITS AND INSPECTIONS
Contractor obtains the permit and schedules inspections. Fees are
[included / billed at cost].

4. PRICE AND PAYMENT
Contract price: $[total], invoiced [monthly for work completed / by the
milestones listed here]. Invoices are due [number] days after receipt.

5. SAFETY
Contractor follows its written safety procedures and the site's posted
rules, including lockout of equipment under repair. Client keeps staff
and the public out of marked work areas.

6. INSURANCE
Contractor carries general liability and workers' compensation insurance
and will provide a certificate naming [client / landlord] on request.

7. CHANGES
Changes need a written change order signed by the person named above.

8. WARRANTY
Labor: [number] months from completion. Fixtures and equipment carry
the manufacturer's warranty.

9. TERMINATION AND DISPUTES
Either party may end this contract for an uncured breach after [number]
days' written notice. Governing law: [state].

Signed: ____________________ Contractor    Date: ________
Signed: ____________________ Client        Date: ________

Name one person who can approve changes. A store manager who asks for three extra receptacles may not have the authority to spend the landlord's money, and you find that out when the invoice is refused.

Template 4: Electrical subcontractor agreement

Use this when a general contractor hires you for the electrical portion of a job, or when you bring in another licensed electrician to help with yours.

ELECTRICAL SUBCONTRACTOR AGREEMENT

Date: [date]
Prime contractor: [company name], [address], [license no.]
Subcontractor: [company name], [address], [license no.]
Project: [owner name, site address]

1. SUBCONTRACT WORK
[e.g., "Rough-in and finish electrical for the kitchen and two
bathrooms per plan sheets E1 and E2, including devices and trim.
Fixtures supplied by owner."]

2. PERMIT
The electrical permit is obtained by [subcontractor / prime contractor]
as the local rules require.

3. SCHEDULE
Rough-in: [dates]. Finish: [dates], after [drywall and paint]. The prime
contractor gives [number] days' notice when each stage is ready.

4. PRICE AND PAYMENT
Subcontract price: $[total].
$[amount] after rough-in inspection passes.
$[amount] after final inspection passes.
Payment is due [number] days after each invoice.

5. INSURANCE AND LICENSE
Subcontractor keeps its license active and carries general liability
and workers' compensation insurance for the length of the project.
Certificates are attached.

6. CHANGES
Extra work needs a written change order from the prime contractor
before it is done.

7. WARRANTY AND CALLBACKS
Subcontractor warrants its work for [number] months and will return
within [number] business days to correct defects in its work.

8. INDEPENDENT CONTRACTOR
Subcontractor is an independent business, supplies its own tools and
crew, and is responsible for its own taxes.

Signed: ____________________ Prime contractor   Date: ________
Signed: ____________________ Subcontractor      Date: ________

Tie each payment to an inspection you control, such as rough-in. A clause that pays you only when the whole remodel is finished leaves your money waiting on the tile setter.

Template 5: Emergency service authorization

A burning smell at the panel at 11 p.m. leaves no time for a long contract. This one-page form authorizes immediate work and records the price basis before you start.

EMERGENCY ELECTRICAL SERVICE AUTHORIZATION

Date and time: [date, time]
Electrician: [company name], [phone], [license no.]
Customer: [name], [service address], [phone]

1. EMERGENCY DESCRIBED BY CUSTOMER
[e.g., "Burning smell and buzzing at main panel, half the house
without power"]

2. WORK AUTHORIZED NOW
Find the fault and make the system safe. [e.g., "Disconnect the
damaged circuit and restore power to the rest of the home."]
Permanent repairs are quoted separately after the hazard is controlled.

3. RATES
After-hours call fee: $[amount]
Labor: $[rate] per hour. Parts at listed price.

4. PAYMENT
Due on completion of the emergency work.

Signed: ____________________ Customer      Date and time: ________
Signed: ____________________ Electrician   Date and time: ________

A signed authorization like this one does not waive a customer's right to cancel under the Cooling-Off Rule. For that, the federal rule calls for a separate statement the customer writes by hand. If your work regularly falls under the rule, ask an attorney how to handle emergency calls in your state.

A white wall-mounted electric vehicle charger with a coiled cable in a residential garage, fed by metal conduit running up the wall

Template 6: Change order

Use a change order whenever the scope, price or schedule moves after signing. You open a wall and find a buried junction box. The customer asks for two more recessed lights while the ceiling is open.

CHANGE ORDER NO. [number]

Original contract date: [date]
Contractor: [company name], [license no.]
Owner: [name], [property address]

1. CHANGE DESCRIBED
[e.g., "Add two recessed LED lights on the existing dining room
switch."]

2. REASON
[Hidden condition / Owner request / Inspector or code requirement]

3. PRICE CHANGE
Added: $[amount]   Credit: $[amount]
Original contract price: $[amount]
Prior change orders: $[amount]
New contract price: $[amount]

4. SCHEDULE CHANGE
[None / Completion moves by [number] working days]

This change order becomes part of the original contract.
No changed work starts until both parties sign.

Signed: ____________________ Contractor    Date: ________
Signed: ____________________ Owner         Date: ________

Number change orders in order and keep a running total on each one. When the final invoice goes out, the customer can trace every dollar back to a signature.

Template 7: Completion and warranty sign-off

Use this on the last day. It confirms the work is done, records the inspection and the warranty, and starts the clock on final payment.

COMPLETION AND WARRANTY SIGN-OFF

Contract date: [date]   Completion date: [date]
Contractor: [company name], [license no.]
Owner: [name], [property address]

1. WORK COMPLETED
All work in the contract dated [date] and change orders [numbers]
is complete. Permit no.: [number]. Final inspection: [passed on date /
not required].

2. TESTS PERFORMED
[e.g., "All new circuits energized and tested at each device. GFCI
and AFCI devices tested with the test button. Panel directory
completed and reviewed with owner."]

3. LABOR WARRANTY
The contractor warrants its workmanship for [number] months/years from
the completion date. The warranty covers failures caused by the
installation. It does not cover damage from surges, lightning, misuse,
alterations by others, or wiring the contractor did not install.

4. MANUFACTURER WARRANTIES
[Panel, charger or fixture brand, model, serial no.]: [term]. Manuals
and warranty papers left with owner.

5. FINAL PAYMENT
Balance due: $[amount], due [on signing / within [number] days].

Owner confirms the work above is complete.

Signed: ____________________ Owner         Date: ________
Signed: ____________________ Contractor    Date: ________

Write the permit number and the inspection date on the form. When the customer sells the house and a buyer's inspector asks about the new panel, the answer is on one page.

How to keep contracts organized

The IRS lists invoices, deposit information and receipt books among the documents that support your gross receipts. Your signed contracts and change orders explain those invoices, so store them together by job.

A simple naming habit helps: customer last name, street, and date, such as "Okafor-2210Alder-2026-12-02". Save the signed PDF, the permit, the change orders and the sign-off in one folder. When a customer calls about a warranty, you open one folder and see the whole job.

Questions electricians ask

Is a verbal agreement enough for an electrical job?

No, not for anything beyond a small repair. Some states require a written contract above a set price, such as California's $500 threshold for home improvement work. Legal Templates also warns that an unsigned agreement is likely unenforceable, so get both signatures before you start.

Should an electrical contract include the license number?

Yes. Texas requires the contractor's name, address, phone number and license number on all proposals, invoices and written contracts. California's board says the contract should identify the contractor's license number. Putting it on every form keeps your paperwork consistent.

Who pulls the permit, the electrician or the customer?

Often the electrician, and the contract should say so either way. Washington requires an electrical contractor to buy the permit for work it does on a customer's property. California requires the contract to state in writing who gets the permits. Name the permit office and who pays the fee.

Can I charge a deposit on an electrical job?

Usually yes, within your state's limits. California caps the down payment at $1,000 or 10 percent of the contract price, whichever is less. Check your own state before you set a deposit amount.

Do I need a lawyer to review these templates?

It is a good idea before you use them widely. Adobe's guide recommends having a lawyer review a contract before you finalize the terms, so it follows local laws and ordinances. Clauses on liability, late fees and cancellation depend on state law, and one review covers every job that follows.

Let customers request a visit online

Most electrical contracts start with a phone call that you miss while you are in an attic. Kejoola gives an electrical business a four-page website with Home, Services, Blog and Contact pages and an online booking form. The form asks for a name, email, phone number and a notes box, so a homeowner can describe the tripping breaker and request a visit after hours. You read the request when you climb down, call back, and send the right contract from the list above.